SEPLAT PETROLEUM DEVELOPMENT COMPANY PLC-
TENDER OPPORTUNITY: GASLIFT COMPRESSION STATION ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) FOR SAPELE FURTHER OIL DEVELOPMENT (FOD) PROJECT
SEPLAT PETROLEUM DEVELOPMENT COMPANY PLC
(ON BEHALF OF THE NPDC/SEPLAT JOINT VENTURE)
TENDER OPPORTUNITY: GASLIFT COMPRESSION STATION ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) FOR SAPELE FURTHER OIL DEVELOPMENT (FOD) PROJECT
1. INTRODUCTION:
As part of the Sapele Further Oil Development (FOD) campaign, SEPLAT Petroleum Development Company PLC (SEPLAT), on behalf of the joint venture of Itself and the Nigerian Petroleum Development Company Limited (NPDC) has deemed it necessary to carry out Gaslift Compression Station Engineering, Procurement, Installation and Commissioning (EPIC) at its Sapele Field to handle anticipated increase in production from OML 41. To execute this EPIC scope, it is mandatory that a competent engineering contractor with proven experience in Gaslift Compression Station in line with SEPLAT’s Sapele Further Oil Development strategy is engaged. The successful contractor shall demonstrate capability in EPIC of Gaslift Compression Station, and by leveraging its experience in conjunction with a reputable Original Equipment Manufacturer (OEM) to provide a detailed technical proposal for gaslift compression Station to be deployed as part of the Sapele FOD Project. The tendering process shall be run on the Nigerian Petroleum Exchange (NipeX) contracting platform.
SERVICES REQUIRED/SCOPE OF WORK:
As a minimum requirement, the selected contractor shall be fully responsible for the provision of service as detailed in the table below for use in the onshore operations.
S/N | SERVICE CODE | TENDER REF. NUMBER | SERVICES | BRIEF DESCRIPTION OF SCOPE OF WORK (INCLUDES BUT IS NOT LIMITED TO THE UNDERSTATED) |
1 | 4.05.09 | SEPLAT/LAG/2020/ENG/136159 | Engineering, Procurement, Installation and Commissioning Services | The service includes Engineering, Procurement, Installation, Commissioning of the following to achieve gas compression duty for gaslift operation of shallow wells by SEPLAT at a greenfield location in Sapele, Delta State:(i) Two (2) units of 10mmscfd compressor packages (2.5barg – 85barg) – driven by reciprocating gas engines(ii) 40mmscfd capacity Balance of plant (Bop) comprising:· Triethylene glycol (TEG) based gas dehydration system· Integral process control and safety instrumented system· Fuel gas conditioning system· Plant and Instrument air system· Flare system· Gaslift distribution system· Open and closed drain system· Tie-in to existing electrical power system· Etc.(iii) Site preparation and civil foundations |