BORNO STATE IBSIP-
INVITATION FOR BIDS FOR INCLUSIVE BASIC SERVICE DELIVERY AND LIVELIHOOD EMPOWERMENT INTEGRATED PROGRAMME
SPECIFIC PROCUREMENT NOTICE (SPN):
BORNO STATE GOVERNMENT OF NIGERIA
INCLUSIVE BASIC SERVICE DELIVERY AND LIVELIHOOD EMPOWERMENT INTEGRATED PROGRAMME
DATE: 25TH JUNE, 2921
LOAN NO: ADB-2000200000701
IFB NO:BO/IBSIP/2021/WORKS/09
1. This Invitation for Bids follows the General Procurement Notice (GPN) for this project that appeared in UNDB online of 5th March, 2019 and on the African Development Bank Group’s Internet Website.
2. The Federal Republic of Nigeria has received financing from the African Development Bank in various currencies towards the cost of Inclusive Basic Service Delivery and Livelihood Empowerment Integrated Programme. It is intended that part of the proceeds of this loan will be applied to eligible payments under the contract for the procurement of works for the construction of Mini water Works in Borno state.
3. The Project Implementation Unit, Inclusive Basic Service Delivery and Livelihood Empowerment Integrated Programme Borno State now invites sealed bids from eligible bidders for the execution of the works for the construction of Mini Water Works at Konduga, Kaga, Hawul, Jere and MMC.
Item No | LOT | DESCRIPTION | Site Location | Bid security (Naira) |
1 | 1 | · Drilling of Borehole (4 in each location)· Installation of pumps and Solar panels (in each location)· Construction of steel elevated Tank (in each location)· Construction of steel surface tank (in each location)· Construction of Security, control room and Fencing (in each location)· Reticulation and array of taps (2 in each location) | · Hawul· Kaga | N6,000,000.00 |
2 | 2 | · Drilling of Borehole (4 in each location)· Installation of pumps and Generator (in each location).· Construction of steel elevated Tank (in each location)· Construction of steel surface tank (in each location)· Construction of Security, generator, control room and Fencing (in each location)· Reticulation and array of taps (2 in each location) | · Konduga· Jere | N9,800,000.00 |
3 | 3 | · Drilling of Borehole (4 in each location)· Installation of pumps and Generator (in each location).· Construction of steel elevated Tank (in each location)· Construction of steel surface tank (in each location)· Construction of Security, generator, control room and Fencing (in each location)· Reticulation and array of taps (2 in each location) | · MMC Location 1· MMC Location 2 | N9,800,000.00 |
No Comments