KADUNA ELECTRIC DISTRIBUTION COMPANY-
INVITATION FOR PRE-QUALIFICATION OF CONTRACTORS FOR 132/33KV TRANSMISSION LINES & SUBSTATIONS REHABILITATION PROJECT AND EQUIPMENT SUPPLY
KADUNA ELECTRIC DISTRIBUTION COMPANY
PUBLIC NOTICE
INVITATION FOR PRE-QUALIFICATION OF CONTRACTORS FOR 132/33KV TRANSMISSION LINES & SUBSTATIONS REHABILITATION PROJECT AND EQUIPMENT SUPPLY
INTRODUCTION
Kaduna Electricity Distribution Company (KAEDC) has received a CREDIT facility from the Central Bank of Nigeria (CBN) for Accelerated Transmission – Distribution Interface Projects to invest in the Transmission Company of Nigeria (TCN)’s rehabilitation and expansion projects.
SCOPE OF WORKS
LOT/KAEDC/LINES/1
Re-conductoring of 132kV Zaria-Funtua-Gusau Single Circuit Transmission Line (190KM)
LOT/KAEDC/SS/1
Upgrading of 1×30 MVA, 132/33kV power transformer with 1×60/66 MVA, 132/33kV at Gusau 132/33kV Substation.
LOT/KAEDC/SS/2
Upgrading of 90MVA, 330/132/33kV Auto transformer with Ix150/165MVA, 330/132/33kV at BirninKebbi 330/132/33kV Substation.
LOT/KAEDC/SS/3
Construction and installation of 1x45MVA Mobile transformer 132/33kV Substation (down dropper on the existing B/Kebbi-Sokoto 132kV S/C transmission line) at Argungu
LOT/KAEDC/SS/4
Installation of 1×60 MVA, 132/33kV power transformer at Sokoto 132/33kV Substation.
LOT/KAEDC/SS/5